Tabora-Igunga and Nzega Towns

Project Name

Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents for Water Supply Improvement Works to   Tabora, Igunga and Nzega Towns, World Bank funded

Technical Details

CLIENT

Ministry of Water


DATES

July 2014 –June 2016: Feasibility Study and Detailed Engineering Design


SCOPE OF WORKS

To develop a cost-effective design for the water supply to Tabora, Igunga and Nzega towns as well as villages located within 12 kilometers from the pipeline route through identification of optimum sources, designing new and rehabilitation of the water supply networks using Lake Victoria as a source, Institutional Capacity Assessment, Carrying ESIA related and Conducting RAP related works.


LOCATION

Tabora – Tanzania


PARTNERS

Metaferia Consulting Engineers & Don Consult Ltd