Sikonge Town

Project Name

Feasibility Study, Detailed Engineering Design, Mobilization of development and Preparation of Tender Documents for Water Supply Improvement Works to Sikonge Towns. World Bank funded

Technical Details

CLIENT

Ministry of Water


DATES

June 2015 – February 2016: Feasibility Study and Detailed Engineering Design


SCOPE OF WORKS

To develop a cost-effective design for the water supply to Sikonge town as well as villages located within 12 kilometers from the pipeline route through identification of optimum sources, designing new and rehabilitation of the water supply networks using Lake Victoria as a source


LOCATION

Tabora – Tanzania


PARTNERS

  • Metaferia Consulting Engineers (Ethiopia) and
  • Don Consult Ltd (Tanzania)