CLIENT
Tanzania National Roads Agency (TANROADS HQ),
DATES
27th June 2024 – To date:
SCOPE OF WORKS
Carrying out Feasibility Study, Environmental and Social Impact Assessment (ESIA), Detailed Engineering Design (DED) and preparation of Tender Documents (TD).
The Study comprises two consecutive phases. The two phases are as follows:
- Phase 1: Feasibility Study including Preliminary Design, Cost Estimates, Preliminary Environmental and Social Impact Assessment (Scoping Exercise) and Development of Preliminary Resettlement Action Plan and Survey of Properties to be affected;
- Phase 2: Detailed Engineering Design, including Detailed Environmental and Social Impact Assessment, Development of Resettlement Action Plan and preparation of Bidding Documents.
LOCATION
Simiyu & Mwanza Regions, Tanzania.
(This road is located in Simiyu and Mwanza Regions, starting at Bariadi town center in Simiyu and ending at Magu town in Mwanza, where it joins the Mwanza – Musoma trunk road. The route traverses multiple centers, including Bariadi, Ibulyu, Mbiti, Ngulyati, Nyanguge, Kilalo, Kasoli, Salama, Bugatu, Mwandu, Ng’haya, Busaranga, Lumeji, Kitongo, Misungwi, Mahaza, Mwabasabi and Magu Township)
PARTNERS
SABA Engineering Plc of Ethiopia